Belt Mistracking, Carryback and Spillage: Stop Paying for the Same TonThree Times
Every ton on the floor is a ton you paid for three times: once to produce it, once toshovel it back, and once in the damage it does on the way down. Spillage is anengineering problem with known causes – and a system that removes them.
What you see → why → the fix
| WHAT YOU SEE | WHY IT HAPPENS | THE FIX |
|---|---|---|
| Belt saws its edges off, runs off pulleys | Off-center loading, no continuous correction | Automatic trackers, upper + lower run |
| Fines under the full return run | Cleaner can’t match the material or hold tension | Carbide cleaner set, self-adjusting tension |
| Material clings to the belt, energy use creeps up | High-friction, worn belt cover | Hot-dip PU belting, ¼ friction |
| Cleanup crews stationed at transfers | All of the above, treated as housekeeping | Full closed-loop line rebuild |
Unmanned Belt Conveying System
Sensors watch the belt, control decides, and the terminals below correct tracking, cleaning and wear continuously — no operator standing by.

TRACKING
Automatic Tracker
4× steering force corrects drift continuously, zero edge damage.
Upper & lower units · non-contact

CLEANING
High-Efficiency Belt Cleaner
Carbide blade set hugs the discharge drum in a 3-D curve as it wears.
85-95% carryback removed

BELTING
Hot-Dip Polyurethane Belt
1/4 the friction of rubber – less adhesion, drag and energy.
Hot-dip molecular bond
Frequently asked questions
Can we buy just a cleaner or a tracker?
Individual terminals are available as replacements within an engineered line. A cleaner fighting an untracked belt fails early, which is why we start from a line assessment and sell the belt line as a system.
How do I choose between tungsten carbide and polyurethane blades?
Tungsten carbide lasts longest on vulcanized belts under heavy duty; polyurethane is the safer choice over mechanical splices or older belt covers. Tell us belt width, speed and splice type and we’ll spec it.
Does installation require stopping production?
Terminal installation is planned into your normal outage windows and performed under lockout. We pre-fabricate mountings to compress downtime.
How do we measure whether it worked?
Two numbers, measured before and after: carryback in grams per square metre of belt, and cleanup labor hours per week. Every project ships with a measurement protocol.
Do you support sites outside China?
Yes — remote engineering, video-guided commissioning and regional partners for on-site work; a commissioning engineer for larger projects.
Show us your worst transfer point.
A photo or 30-second video of the belt problem is enough. A Devondi engineer replies within 24 hours with a root-cause read and a staged fix.
