WE HEAR THESE QUESTIONS EVERY WEEK — WE UNDERSTAND

It doesn't have to work this way. We make material flow - automatically.

Those questions are exactly why Devondi exists. We solve the problem as a systemblockages cleared at their source in 0.2 seconds, discharge metered to your process, silo capacity recovered to 70%+, and nobody ever entering a silo again.

HOW WE SOLVE YOUR CHALLENGES

Stop buying hardware. Start managing flow.

We don’t just clear blockages; we automate your entire material flow strategy.

Wide-angle view of industrial silos with clear blue sky, captured during daytime, showcasing modern industry.

SUCCESS CASES – WE’VE DONE THIS BEFORE

Already solved, on some of heavy industry's hardest sites

Mining, steel and coal groups ran years of manual clearing before calling us. Here is what changed:

dfd industrial clients and partners for air cannons

Every one of these started with a photo of a blocked point and a material spec. The full problem-solution-case breakdown for each industry is one click away.

GLOBAL FIRST – WHAT WE’VE DONE

devondi global first stable operation of air blasters in extreme cold down to 40°c
Stable Operation of Air Blasters in Extreme Cold Down to -40°C
devondi global first optimizing flat bottom bin space to maximize storage capacity
Optimizing Flat-Bottom Bin Space to Maximize Storage Capacity
devondi global first direct feeding of coal slime overcoming the global challenge of high viscosity storage
Direct feeding of coal slime: solving high-viscosity storage

YOUR TURN — TALK TO US

Send one photo of your blocked point. Get an engineering diagnosis back.

Looking for a professional site assessment?Our engineers review your material, moisture and operating conditions and reply within 24 hours with a diagnosis and a recommended fix.

What happens next

01 · Engineering review

Your material data and photos, checked against comparable delivered cases.

02 · Remote diagnosis

A working-condition session to pinpoint the mechanism - arch, rathole, caking.

03 · Solution proposal

Equipment + control logic + platform; delivery in 1 - 2 months, 100% factory - tested.
Scroll to Top